Towards a fully integrated North Sea offshore grid: An engineering‐economic assessment of a power link island

Full article on Wiley Online Library:   HTML PDF

Can't access this content? Tell your librarian.

An increasing share of variable power feed‐in is expected in the next decades in the European power system, with a particularly high offshore wind potential in the North Sea region. This demands more temporal‐ and spatial flexibility in the system, an adequate grid infrastructure can provide both. This study presents an engineering‐economic approach evaluating the impact of novel infrastructure designs towards a fully integrated North Sea offshore grid, including TenneT’s vision of a power link island (PLI). A PLI is an artificial island for transnational power exchange and distribution of offshore wind resources. We introduce the concept and evaluate the economic benefits and system implications under three different case studies incorporating 2030 scenarios from European Network of Transmission System Operators. The results demonstrate system cost savings up to 15.8% when comparing a fully integrated PLI solution with traditional, radial typologies. The PLI did in general result in more efficient system dispatch of wind resources, where the involvement from Norway, Great Britain, and Germany occurred most frequently in terms of grid reinforcements and expansions. This article is categorized under: Wind Power > Systems and Infrastructure Energy Infrastructure > Systems and Infrastructure Energy Systems Economics > Systems and Infrastructure
Illustration of different levels of grid integration ranging from radial solutions (in the two upper brackets) to integrated, or meshed, solutions (in the two lower brackets). The solution depicted in the lower‐right corner represents a full power link island (PLI) integration. Source: Solli ()
[ Normal View | Magnified View ]
Grid expansions moving from Scenario A (left plot) to Scenario C (right plot), that is, towards full integration of a PLI as a multinational hub for both cross‐border exchange and offshore wind power distribution. Illustrations are based on Vision 1
[ Normal View | Magnified View ]
Investment (green) and operational costs (blue) from the nine different case studies using data from European Network of Transmission System Operators (ENTSO‐E) least ambitious scenario Vision 1 (left part) and Vision 4 (right part) with high shares of variable renewable energy source (VRES)
[ Normal View | Magnified View ]
Illustration of the base case grid infrastructure used in the model. The orange dot represents the expected location for a power link island
[ Normal View | Magnified View ]

Related Articles

Design and operation of power systems with large amounts of wind and solar energy

Browse by Topic

Energy Systems Economics > Systems and Infrastructure
Wind Power > Systems and Infrastructure
Energy Infrastructure > Systems and Infrastructure

Access to this WIREs title is by subscription only.

Recommend to Your
Librarian Now!

The latest WIREs articles in your inbox

Sign Up for Article Alerts